MCD now accepting names for New Mower “Naming Contest”

MCD announces a naming contest - you can suggest names for a new remote-operated robotic mower. The contest kicks off Friday, July 28 and will accept names until August 11. To properly maintain a large integrated flood protection system that includes five dams and 55 miles of levees - there are lots of steep slopes … Continue reading MCD now accepting names for New Mower “Naming Contest”

Why do some bike trails go under water?

Fortunately, the Miami Conservancy District’s flood protection system keeps high river water levels in the river channel – and out of our communities. The managed lands that are part of this system are also available to locate the bike trails – so trail users don’t have to walk, run, or ride on the roads. MCD’s riverfront levees and preserved floodplains provide a unique venue for recreation such as bike trails, riverfront parks, and boat launches. But that also means these places store water to safely pass through the city during heavy rains.

Behind-the-scenes with MCD’s staff during high-water

By Ben Casper, operations and maintenance manager Great Miami River cities don’t flood, though average annual precipitation has been increasing. The MCD flood protection system was designed to protect 47,000 properties and keep 1 million people safe. The number of annual high-water events at MCD flood-control dams have been trending up for the past three … Continue reading Behind-the-scenes with MCD’s staff during high-water

Are you building for yesterday’s storm, or tomorrow’s?

By Mike Ekberg, manager of water resource monitoring and analysis Any community that needs to replace or build a bridge, culvert, stormwater system, or conduct a floodplain analysis must compute peak stream flows during the design process. Understanding peak stream flows ensures the infrastructure will be designed large enough to handle rainfall and runoff. In … Continue reading Are you building for yesterday’s storm, or tomorrow’s?

The Year 2021: Redefining “Normal”

By Mike Ekberg, Manager of water resource monitoring and analysis At MCD, we track water movement into and out of the Great Miami River Watershed over long periods of time, spanning decades. The records generated at precipitation stations, stream gages, and observation wells enable MCD staff to track long-term trends in water resources. Water enters … Continue reading The Year 2021: Redefining “Normal”

This year marks 100 years of flood protection by MCD

By Don O'Connor, Chief Engineer While there is a persistent fear of flooding in cities around the world, people and businesses along the Great Miami River go confidently about their lives hardly giving flooding a thought. Since 1922, homes and businesses have been protected by MCD’s system of five dry dams, retarding basins, 55 miles of levees, and … Continue reading This year marks 100 years of flood protection by MCD

MCD dams storing water more often than ever before

By Mike Ekberg, manager of water resources monitoring and analysis MCD flood protection dams are storing water more often than at any other time since the dams were completed almost 100 years ago. That’s because the Miami Valley’s climate is getting wetter. Can the flood protection dams handle more rain? A rising 30-year average precipitationAverage annual … Continue reading MCD dams storing water more often than ever before

2020 Precipitation: Up, Down and All Around

By Mike Ekberg, manager of water resources monitoring and analysisNote: At MCD, we track water movement into and out of Great Miami River Watershed over long periods of time, spanning decades. The records generated by our observer precipitation stations, stream gages, and observation wells allow MCD staff to examine long-term trends in water resources. Water … Continue reading 2020 Precipitation: Up, Down and All Around

Dam concrete repair necessary to ensure future performance

By Don O’Connor, P.E., chief of construction and planning MCD is committed to keeping the dams and other flood protection structures operating safely and properly for your protection. To that end, we are nearing completion on a $2.61 million project to improve concrete at Lockington Dam. Over the last 13 months, MCD’s contractor has removed … Continue reading Dam concrete repair necessary to ensure future performance